SR-94/Kendall Dr. Resurfacing and Safety Improvements

Civil Works Projects

Category

Roadway, Drainage

Client

FDOT

Project Dates

2017 - 2020

Project Budget

$ 4.9M

This award-winning project involved the rehabilitation and safety enhancement of a 2.095-mile section of SR-94/Kendall Dr. in Miami-Dade County, Florida, between SW 150 Ave. and SW 132 Ave. The total project budget was $4.9 million, and it was recognized with a 2022 FTBA ‘Best in Construction’ Award.

Project goals

  • Improve the overall quality and condition of the roadway surface through milling and resurfacing.
  • Enhance accessibility for pedestrians and individuals with disabilities with ADA-compliant upgrades.
  • Increase traffic flow efficiency with signal upgrades and pavement markings.
  • Improve drainage systems to prevent flooding and water damage.
  • Beautify the corridor with landscaping enhancements.
  • Increase safety for drivers and pedestrians with median modifications and pavement widening at SW 147 Ave.
  • Foster community engagement through participation in the public hearing for median closure.

Final outcome

SR-94/Kendall Dr. in Miami-Dade County, Florida, between SW 150 Ave. and SW 132 Ave. The total project budget was $4.9 million.

  • A smoother, safer, and more accessible roadway for all users.
  • Improved drainage infrastructure for better stormwater management.
  • Enhanced aesthetics and visual appeal of the corridor.
  • Increased traffic flow and reduced congestion.
  • Safer pedestrian crossings and medians.
  • Successful community engagement and collaboration.

Challenges and Solutions: The project team faced the challenge of avoiding conflicts with existing underground utilities. CWI overcame this hurdle through meticulous investigations, clear communication with utility owners, and a one-on-one approach.